Global filters

Network Control Tower

One consolidated view of inventory truth across 412 nodes, 10 brands and 4 channels — built from RFID observations reconciled with ERP, WMS, POS and OMS records.

Priority briefing

Needs approval

7 critical inventory actions require attention across 7 stores

6 tasks are past SLA. Unresolved phantom-stock and misplaced-item exceptions are reducing on-shelf availability.

Updated --:--:-- · Scope: All regions · Owned by 3 store managers · Escalation owner: Regional Operations Manager

Inventory accuracy

97.1%

2.4%vs. 30d

On-shelf availability

94.8%

1.3%vs. 30d

Phantom stock rate

1.9%

0.4%vs. 7d

Open exceptions

18,420

6.2%vs. 7d

Value at risk

$9.4M

3.1%vs. 7d

RFID node coverage

86%

4%wave 4 live

What changed since yesterday

Ranked by business impact, not by event volume

  • Phantom stock up 18% in EMEA full-price

    High

    7 stores crossed the 2.5% phantom threshold after the FW25 floorset.

    $412K exposed sales· Regional Operations ManagerInvestigate
  • Inbound receiving accuracy improved to 99.2%

    Low

    Dock-door verification now covers 61 of 74 outlet nodes.

    -$96K chargeback exposure· DC AssuranceAutomatic
  • Consignment mismatch at 4 APAC concessions

    Critical

    Settlement file variance exceeds tolerance for 2 consecutive cycles.

    $188K unreconciled· Global Inventory DirectorNeeds approval
  • Back-room misplacement cleared in Americas

    Low

    Guided replenishment closed 1,240 units of hidden stock.

    +1.4pt availability· Store OperationsAutomatic

Inventory accuracy and availability trend

RFID-enabled nodes vs. legacy counted nodes, 14 days

Inventory state by channel

Observed on-hand vs. sellable and phantom units

RFID event funnel

Raw reads curated into business events (last 24h)

  • Raw RFID reads48,920,400
  • Deduplicated12,408,900
  • Zone-resolved11,920,100
  • Curated item events9,104,600
  • Business events1,284,300
  • Exceptions raised18,420

Top business exceptions

Ranked by exposed value, with recommended action mode

View all
ExceptionLocationUnitsValueSeverityAction

Return not restocked

EXC-28418 · confidence 95%

JanSport Shanghai Concession143$38KMediumAutomatic

Consignment mismatch

EXC-28426 · confidence 87%

Timberland Shanghai Concession157$35KMediumInvestigate

Consignment mismatch

EXC-28416 · confidence 77%

JanSport Amsterdam DC136$34KCriticalNeeds approval

Reservation without stock

EXC-28409 · confidence 84%

icebreaker Portland Partner111$29KHighAutomatic

Misplaced in back room

EXC-28415 · confidence 82%

Vans Sydney 3PL Hub126$28KLowAutomatic

Unread source tag

EXC-28417 · confidence 80%

Vans Portland Partner117$28KHighInvestigate

Network task queue

Work generated from exceptions, owned by a named team

  • Replenish floor from back room

    Critical

    The North Face Denver Store

    Store team · due 4h$635
  • Cycle count zone B2

    High

    Kipling Stockholm Outlet

    Regional ops · due 11h$7K
  • Verify inbound ASN discrepancy

    Medium

    Eastpak Melbourne Concession

    LP team · due 2h$16K
  • Restock returned units

    Critical

    Napapijri Madrid DC

    Store team · due 3h$13K
  • Re-tag unread source items

    High

    icebreaker Sydney 3PL Hub

    Regional ops · due 6h$14K
  • Resolve consignment mismatch

    Medium

    Timberland Toronto Store

    LP team · due 3h$18K

Lowest-confidence nodes

Accuracy below network target of 96%

NodeTypeRegionAccuracyPhantomValue at riskState
icebreaker Sydney 3PL Hub

3PL-1035 · Owned

3PLAPAC79.9%10.8%$36KCritical
Napapijri Melbourne Concession

ST-1038 · Concession

ConcessionAPAC79.9%12.2%$7KCritical
JanSport Mexico City Store

ST-1006 · Owned

StoreAmericas80.1%5.9%$7KCritical
Altra Boston Partner

ST-1063 · Wholesale

PartnerAmericas80.2%4.6%$6KCritical
Vans Milan Outlet

ST-1001 · Owned

OutletEMEA80.5%12.4%$53KCritical
The North Face Munich DC

DC-1010 · Owned

DCEMEA80.5%8.9%$10KCritical
Smartwool Milan Outlet

ST-1049 · Owned

OutletEMEA81%7.4%$3KCritical
Napapijri Madrid DC

DC-1028 · Owned

DCEMEA81.1%6%$17KCritical

RFID rollout and data coverage

Nodes live on the inventory engine

  • Wave 1 · Americas DTC148/148
  • Wave 2 · EMEA DTC118/122
  • Wave 3 · Outlet network61/74
  • Wave 4 · APAC concession29/68

Value opportunity

Annualised, synthetic modelling

  • Avoided lost sales (availability)$42.8M
  • Working capital release$28.4M
  • Shrink explained and prevented$11.9M
  • Cycle-count labour productivity$8.6M
  • Chargeback and claim recovery$4.3M

$96.0M modelled annual opportunity